Project Description

Hygienic, slip resistant, and easy-clean surfaces were essential requirements for this new cheese manufacturing facility. After a large amount of concrete prefill to create sections and falls in the 1200m2 floor area, Nuplex Traxite was laid in the lower traffic areas where machinery such as forklifts wouldn’t be used. Nuplex SureShield was applied in the main processing area to cope with higher traffic and ingredients used during processing. With other areas still under construction, there is more specialised flooring and coatings to be done, so watch this space.

What Our team provided

Concrete Prefill
Nuplex SureShield
Nuplex Traxite
Top Quality Finish
Back to top